Custom Cabinets for New Construction
Custom cabinets for new construction should be discussed while your house plans are still taking shape. Preliminary drawings help define scope; verified measurements and approved cabinet drawings come before production.
An Ohio-based, independent cabinetry quote and referral service. Project fit and availability are reviewed individually. About Amish Cabinet Select

Plan the Decisions in the Right Order
Your builder’s schedule and the cabinetmaker’s process set the actual dates. This sequence identifies what needs to be coordinated at each stage.
While the House Is on Paper
List the rooms that need cabinetry and share the latest floor plan. Identify tall storage, islands, built-ins, and any details that affect windows, doors, or room circulation. Discuss the cabinetry budget separately from the total build budget.
Before Rough-In Locations Are Finalized
Coordinate the proposed cabinet layout with the builder and relevant trades. Sink locations, appliance requirements, outlets, vents, and lighting can affect cabinet openings. Use current appliance and fixture specifications.
Before Production Is Authorized
Confirm who takes final site measurements and checks them against the approved drawings. Review material samples, appliance openings, hardware, and finished ends. Record the drawing revision, approval date, and any remaining conditions.
Before Delivery & Installation
Check site access, room readiness, storage conditions, unloading, and installer availability. Ask the maker and installer what must be complete before cabinets arrive, including any requirements for flooring and interior conditions.
Assign Each Approval to a Person
A homeowner, builder, designer, and cabinetmaker may all be involved. Establish one shared version of the plans and a clear path for changes.
| Decision | People to involve | What to record |
|---|---|---|
| Room and cabinet layout | Homeowner, designer, builder, and cabinetmaker. | Room names, layout revision, and the approved scope. |
| Appliance and fixture openings | Cabinetmaker and the relevant supplier or trade. | Model numbers, manufacturer requirements, and responsible reviewer. |
| Final site dimensions | The agreed measuring professional and cabinetmaker. | Verified measurements and how discrepancies are resolved. |
| Order release and changes | The person authorized to approve, plus the cabinetmaker. | Written approval, price changes, and schedule implications. |
| Receiving and installation | Builder, delivery provider, and installer. | Access, unloading, storage, site readiness, and installation scope. |
Send Preliminary Plans with Useful Context
Include the drawing date, project location, target construction stage, and the rooms you want quoted. Explain whether a builder or designer is already involved and who should coordinate cabinet decisions.
If you have not chosen appliances or finishes, say so. A preliminary discussion can identify open questions; it should not be treated as authorization to build.
Create a room-by-room project brief to carry into your inquiry.
New-Construction Questions
Start planning early, then confirm the project-specific schedule with the people doing the work.
How far ahead should I order the cabinets?
Ask the cabinetmaker about current design, approval, production, and delivery timing. There is no single lead time that applies to every project, and an order may depend on verified dimensions and site readiness.
Can a quote start from an architectural floor plan?
Yes, you can send preliminary plans for review. A final cabinet price or production release may require elevations, appliance details, final measurements, and more specific selections.
Will Amish Cabinet Select coordinate my building trades?
We are a quote and referral service. Design, measurement, trade coordination, and installation responsibilities must be agreed with the cabinetmaker and your building team.
Bring Your Plans. Start a Conversation.
Share the room, the look you want, and the details you know. Plans and photos can be added to your request.